Wednesday, February 20, 2019
Armco Inc. â⬠Midwestern Steel Division Essay
Armco Inc is a steel producer that used to be the sixth largest in its industry in get together States in 1990. The Kansas City Works within its Midwestern Steel socio-economic class was hit by the decline in the business in the US steel industry. The firm produces grinding media and carbon cable rod. The first one and only(a) has been successful in the industry with its great durability compared to the competitors. Carbon wire rods on the new(prenominal) hand were non profitable and covered only around of its fixed costs through its intersection volume. The sr. performance bill body used by Armco Inc did not work properly because it had whatsoever problems. First, it did not provide information on the product mix existence produced while it provided data on total tonnage produced barely didnt breakdown what was produced. Second the measurement system compared actual to objective but didnt provide data on what positionors exactly caused variance. Third, the costs were not broken down by fixed costs, variable costs and germane(predicate) range. Also the reports were generated on the 15th day following every month ending so I think managers could not take ready corrective actions which would project been fewtimes very necessary. In my opinion, also the fact that the system did not measure Key Performance Index for distributively department such as the fresh system, is one important mind why the elder system was inadequate. Even if the operating managers liked the old system, the unused system was necessary.The operating managers may have liked the old system probably because it is understandable that no one likes to be travel out of their familiar comfort zone after m either years. In my opinion the greatest weakness of the old system is that the data it provides isnt clear enough and it is quite difficult to read and understand properly. The new system for instance proposes to focus on ten different measures. The measures have exact goals which is positive. It is also good point that with the new system production managers were no longer held accountable for all costs incurred. It has to be state that the implementation of the process of the new system was done so luxuriant that the top managers could not train other managers to use the new system. I think this was quite a problem. Some actions or changes could be recommended for the new system. For example in my opinion it would probably be good to ready the fixed and variable costs so that managers could have an idea of the differences of distributively type of costs. Also the proper training supply for the managers would be more than than important thing to do. Because there were some uncontrollable factors which affected importantly the production process I think Armco Inc could try to ask some energy companies to diagnose the transformer failures and figure out if there were any other ways to fix the problem permanently. They also could consider having some generators to tush up the realistic power failures so that the production would not go suddenly.I read the documentary twice and made some notes around the key points. Then I tried to figure out the problems and the possible conclusions to them. I learned about the importance of proper measurement system and the importance of the functional training program for the managers if there are any changes in the important practices of the firm.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.